Waste Logistics & Disposition
Translate quantity estimates into handling, transport, placement and disposition planning inputs.
QUANTITYLoose / compacted volume
CAPACITYTruck/container effective capacity
THROUGHPUTFleet size × cycle × workday
PLACEMENTArea, depth and utilization
Load Counts
Estimate loaded trips from the selected volume basis and effective carrying capacity.
Fleet Productivity
Evaluate loads/day using fleet size, cycle duration and workday assumptions.
Placement Requirements
Estimate post-compaction placement footprint from depth and utilization.
